Current Projects
Omana North Apartments













Construction
Location: Milford, Auckland
Client: S&G Construction
Value: $2,500,000
Period: Mar 2020 – Current
Scope of Hydraulic Works:
- Supply and Installation of Sanitaryware
- Installation of Underslab Soil & Waste
- Supply and Installation of Water reticulation pipework
- Supply and Installation of Internal Soil and waste pipework
- Supply and Installation of Rheem Mains Pressure HWC’s
- Supply and Installation of Dual Cold water booster pump
- Supply and Installation of pulse capable water meters
- Supply and Installation of Down pipes
- O+M Manuals
- As-built drawings
About Omana North Apartments
The Omana North Apartment development is a sophisticated, architecturally designed modern building. The building comprises 63 apartments with a secure separate carpark, storage, swimming pool and gym.
Waipapa Apartments




Construction
Project: Multi Unit Residential
Location: Mairangi Bay, Auckland
Client: Teak Construction
Value: $580,000
Period: Dec 2021 – Current
Scope of Hydraulic Works:
- Supply and Installation of Sanitaryware
- Supply and Installation of Incoming water mains in MDPE
- Supply and Installation of Underslab soil and waste
- Supply and Installation of Water reticulation pipework
- Supply and Installation of Internal Soil and Waste pipework
- Supply and Installation of backflow prevention.
- Supply/installation of gas reticulation
- Supply and Installation of Mains Pressure HWC
- Supply and installation of all downpipes
- Supply/installation of apartment water meters
- Supply & installation of Acoustic lagging to pipework
- Supply & installation of balcony outlets and overflows
- O+M Manuals
- As-built drawings
About Waipapa Apartments (Mairangi Bay)
The Waipapa Apartments consist of a 4-storey dual structure constructed of a mixture of precast concrete, in-situ concrete and structural steel. The ground floor of the dual structure houses two retail premises, a covered car park for tenants and residences and a podium roof that acts as a courtyard for residences to enjoy the afternoon sun.
45 Mt Eden Apartments






Construction
Project; Multi Unit Residential
Location: Mt Eden
Client: Teak Construction
Value $600,000
Period: Jul 21 – Current
Scope of Hydraulic Works:
- Installation of Sanitaryware
- Supply and Installation of Underslab soil and waste
- Supply and Installation of Oil Grit Interceptor
- Supply and Installation of Grundfos Unilift KP 250-A1 Sub pump
- Supply and Installation of water reticulation pipework
- Supply and Installation of pulse capable water meters
- Supply and Installation of Sanitary Sewer pipework
- Supply and Installation of Acoustic lagging to internal Sanitary Sewer PCV
- Supply/Installation of internal PVC downpipes
- Supply/installation of External Copper downpipes.
- Supply installation of Balcony outlets & overflows
- O+M Manuals
- As-built drawings
About Mt Eden Apartments:
Located in a Grammar-zone site just up the hill from the new City Rail Link station in Eden Terrace, 45 Mt Eden is an architect-led development of 14 apartments with a Homestar 6 rating
Previous Projects
On Point Apartments, Point Chevalier





















Construction
Project: Multi Unit Residential
Location: Point Chevalier, Auckland
Client: Waide Construction
Value: 1,530,000
Period: Jul 19 – Mar 21
Hydraulic Scope of Works:
- Supply and Installation of Underslab Soil and Waste
- Supply and Installation of Backflow devices
- Supply and Installation of Sanitaryware
- Supply and Installation of Water reticulation pipework
- Supply and Installation on Internal Soil and Waste pipework
- Supply and Installation of Suspended Stormwater pipework
- Supply and Installation of balcony/sump Allproof Sureflow Plastic outlets
- O+M Manuals
- As-built drawings
Lighthouse Apartments, K Road



Construction
Project: Lighthouse Apartments
Location: K Road, Auckland
Client: Amstar Construction
Value: $600,000
Period: Oct 2018 – Sep 2020
Hydraulic Scope of Works:
- Hydraulic Scope of Works:
- Supply and Installation of water reticulation pipework
- Supply and Installation on Suspended internal Sanitary Sewer pipework
- Supply and Installation of Lowara Pump set, backflow devices, apartment and retail water meters with wireless transmitters
- Supply and Installation of 80mm Allproof Sureflow balcony outlets
- Supply and Installation for 80mm & 100mm PVC Unpainted down pipes as detailed Concrete floor penetrations for plumbing services only
- Allproof passive fire protection to sanitary stack work, water supplies
- Installation of – 31no Mains Pressure HWC’s
- Supply and Installation 2no 1050mm manholes
- Supply and Installation 2no 600mm Chamber including reflux valve
- Supply and Installation of 3no 300x300x600 Cesspits
- Supply and Installation of 160mm PE100 SR17 thrusted pipework
- Supply and Installation underslab pipework as detailed
- O+M Manuals
- As-built drawings
About Lighthouse Apartments:
Located in the heart of the city surrounded by art and culture, lighthouse apartments stand tall on the crest of Karangahape Road. The positioning of this building affords most of its apartments with panoramic views of the city.
These apartments are luxury for the city dweller. Designed and engineered with top quality products that will stand the test of time.
CostCo Fuel Station








Construction
Project: CostCo Fuel Station
Location: Westgate, Auckland
Client: Haydn & Rollett Construction
Value: $35,000
Period: Aug 2021 – Mar 2022
Hydraulic Scope of Works:
- Hydraulic Scope of Works:
- Supply and Installation of Sanitaryware
- Supply and Installation of Underslab soil and waste
- Supply and Installation of Water reticulation pipework
- Supply and Installation of Internal Soil and Waste pipework
- Supply and Installation of Channel drains
- Supply and Installation of downpipes including droppers and overflows
- O+M Manuals
- As-built drawings
About Lighthouse Apartments:
The much anticipated opening of NZ’s first CostCo warehouse. Eagle Plumbing was selected to complete the plumbing and internal drainage for the new fuel facility.
Leader Food Manufacturing Extension






Construction
Project: Leader extension
Location: Otahuhu, Auckland
Client: Q Construction
Value: $310,000
Period: Feb 2019 – Nov 2019
Hydraulic Scope of Works:
- Supply and Installation of Sanitaryware
- Supply and Installation of Underslab soil and waste pipes amenities area
- Supply and Installation of Underslab Stainless Steel pipework & Blucher Floor Drains terminating 1m past the building line
- Supply and Installation of water reticulation pipework
- Supply and Installation on Internal Sanitary Sewer pipework
- Supply and Installation of – 1no Rheem 300L Mains Pressure HWC
- Supply and Installation of custom made stainless steel wash troughs and basin
- O+M Manuals
- As-built drawings
About Leader:
Leader specialises in frozen convenience foods. Eagle Plumbing was selected to complete the plumbing and internal drainage on their new manufacturing facility.

Bidfood Processing Plant
Construction
Project: Food Services
Location: Mt Wellington, Auckland
Client: Q Construction
Value: $320,000
Period: Sep 2017 – Jan 2018
Hydraulic Scope of Works:
- Supply and Installation of Tradewaste pipework (Blucher Stainless Steel).
- Supply and Installation of floor drains
- O+M Manuals
- As-built drawings

Sherratt Ingredients
Construction
Project: Food Services
Location: Hobsonville, Auckland
Client: Waide Construction
Value: $200,000
Period: Aug 2016 – Aug 2017
Hydraulic Scope of Works:
- Supply and Installation of water reticulation pipework
- Supply and Installation on Sanitary Sewer pipework
- Supply and Installation of HDPE pipework
- Supply and Installation of Mains Pressure HWC’s
- Hardfill to trenches to sub grade level only
- Cart away of excavated material onsite
- Supply and Installation of Sanitaryware as detailed
- O+M Manuals
- As-built drawings
43-57 Fred Taylor Drive















Construction
Project: Industrial/Commercial
Location: Westgate, Auckland
Client: Waide Construction
Value: $140,000
Period: Sep 2019 – May 2020
Hydraulic Scope of Works:
- Supply and Installation of Sanitaryware
- Supply and Installation of Water mains
- Supply and Installation of Underslab soil and waste
- Supply and Installation of water reticulation pipework
- Supply and Installation of Sanitary Sewer pipework
- Supply and Installation of Siphonic Stormwater pipework
- Supply and Installation of 2no – Mains Pressure HWC
- Supply and Installation of Allproof Level Threshold to entrance only
- Supply and Installation of Waste Water Pump Station incl Lowara Domo 7VX Pump
- O+M Manuals
- As-built drawings
47 Dalgety Drive





























Construction
Project: Industrial
Location: Wiri, Auckland
Client: Haydn Rollett
Value: $110,000
Period: Mar 2021 – Mar 2022
Hydraulic Scope of Works:
-
Supply and Installation of Sanitaryware
-
Supply and Installation of Water mains
-
Supply and Installation of Underslab soil and waste
-
Supply and Installation of water reticulation pipework
-
Supply and Installation of Sanitary Sewer pipework
-
Supply and Installation of Siphonic Stormwater pipework
-
Supply and Installation of 2no – Mains Pressure HWC
-
Supply and Installation of Allproof Level Threshold to entrance only
-
Supply and Installation of Waste Water Pump Station incl Lowara Domo 7VX Pump
-
O+M Manuals
-
As-built drawings
ACC






Construction
Project: Office fitout
Location: Manukau, Auckland
Client: Q Interiors
Value: $75,000
Period: Jan 2021 – July 2021
Hydraulic Scope of Works:
-
Disconnection of kitchen/s
-
Alterations of plumbing to suit new water/waste setout.
-
Supply of tapware & Billy units
-
Supply and install zenith hydro tap
Porana Road Office/Warehouse Refit
Construction
Project: Commercial
Location: Glenfield, Auckland
Client: Q Interiors
Value: $50,000
Period: Aug 2020 – May 2021
Hydraulic Scope of Works:
-
Supply and Installation of Sanitaryware as detailed
-
Supply and Installation of Underslab soil and waste as detailed
-
Supply and Installation of Water reticulation pipework as detailed
-
Supply and Installation of Internal Soil and Waste pipework as detailed
-
Supply and Installation of New 180l Mains Pressure HWC as detailed
-
O+M Manuals
-
As-built drawings (Hand marked)
About Porana Road Project:
Block of offices and warehouses. Eagle Plumbing collaborated with the main contractor to complete the refit of kitchen and bathroom facilities.
Library 27 Apartments









Construction
Project: Multi Unit Residential
Location: Auckland City, Auckland
Client: Woodview Construction
Value: $1,500,000
Period: Nov 2017 – Jan 2021
Hydraulic Scope of Works:
-
Supply and Installation of Sanitaryware as detailed
-
Supply and Installation of Underslab soil and waste as detailed
-
Supply and Installation of Water reticulation pipework as detailed
-
Supply and Installation of Internal Soil and Waste pipework as detailed
-
Supply and Installation of New 180l Mains Pressure HWC as detailed
-
O+M Manuals
-
As-built drawings (Hand marked)